DOCUMENTS

Project information from 2017 through the current phase is available below.

Draft Alternatives

General Materials 2021

2021

UDOT Cottonwood Canyons Podcast

Episode 1: An Introduction to the Little Cottonwood Canyon EIS
Episode 3: Little Cottonwood Canyon EIS Gondola Alternatives
Episode 4: Little Cottonwood Canyon EIS Cog Rail Alternative
Episode 5: Little Cottonwood Canyon EIS Sub-Alternatives & the Kitchen Sink

Draft Alternatives 2020

General Materials 2020

Purpose & Need and Alternative Screening Criteria 2019-2020

Scoping 2019

SCOPING 2018

OTHER COMMENTS